Rate this venue        
A bit of a dumpSubstandardGood standardExcellent facilitiesWorld-Class venue (8 votes, average: 4.88/5)
Loading ... Loading ...

Beijing // China | Hosted: 2008 Beijing Olympic Games Event Location

Mapping

Profile


Beijing National Stadium (simplified Chinese: 北京国家体育场; traditional Chinese: 北京國家體育場; pinyin: Běijīng Guójiā Tǐyùchǎng), also known as the National Stadium (国家体育场),or colloquially as the “Bird’s Nest” (鸟巢), is a stadium in Beijing, China. The stadium was designed for use throughout the 2008 Summer Olympics and Paralympics.

Located in the Olympic Green, the US$423 million stadium is the world’s largest steel structure. The design was awarded to a submission from the Swiss architecture firm Herzog & de Meuron in April 2003, after a bidding process that included 13 final submissions. The design, which originated from the study of Chinese ceramics, implemented steel beams in order to hide supports for the retractable roof; giving the stadium the appearance of a “Bird’s nest”. Ironically, the retractable roof was later removed from the design after inspiring the stadium’s most recognizable aspect. Ground was broken in December 2003 and the stadium officially opened in June 2008. A shopping mall and a hotel are planned to be constructed to increase use of the stadium, which will host football events after the Olympics.

Features

The eastern and western stands of Beijing National Stadium are higher than northern and southern stands, in order to improve sightlines. A 24-hour per day rainwater collector is located near the stadium; after water is purified, it is used throughout and around the stadium. Pipes placed under the playing surface gather heat in the winter to warm the stadium and coldness in the summer to cool the stadium. The stadium’s design originally called for a capacity of 100,000 people; however 9,000 were removed during a simplification of the design. The new total of 91,000 would be shaved further when 11,000 temporary seats were removed after the 2008 Olympics; bringing the stadium’s capacity to 80,000. The farthest seat is 460 feet (140 metres) from center field. Temperature and airflow of every surface were optimized to increase ventilation.

Beijing National Stadium hosted the Opening and Closing Ceremonies, athletic events, and football final of the 2008 Summer Olympics, from 8 August to 24 August 2008. The stadium also hosted the Opening and Closing ceremonies and athletic events of the 2008 Summer Paralympics from 6 September to 17 September 2008. Though designed for track & field events of the Olympics, the stadium will continue to host sporting events, such as football, afterwards. A shopping mall and a hotel, with rooms overlooking the field, are planned to help increase use after the Olympics. Li stated, “This will become the most important public space in Beijing.”

(source .. wikipedia) reproduced under GFDL

[ Anything to add? Spotted an error? Click here to improve this entry ]

Images


Click for our Beijing 2008 Olympics Special including Photo Threads

beijing national stadium beijing national stadium beijing national stadium

beijing national stadium El nido olimpico El nido olimpico

the bird's nest DSC_6531_XL Mas nido

2008 Beijing Paralympic 2008 Beijing Paralympic 2008 Beijing Paralympic

2008 Beijing Paralympic 2008 Beijing Paralympic 2008 Beijing Paralympic

Why not add your photos?
Some of the above images are reproduced from external sources under the license of the Creative Commons Project

Useful Links


wikipedia entry
The Olympic Movement

[ Anything to add? Spotted an error? Click here to improve this entry ]

Your Reviews

Add your Review

Your review:
Offensive content and language will be removed

By clicking submit, I agree that these comments are my own and do not represent the opinions of sportingsights.com.